Oil and gas elastomer qualification: NORSOK M-710, ISO 23936-2, API 6A and NACE TM0297

The main documents that qualify elastomers for sour gas, rapid gas decompression and long-term immersion, and what a buyer should ask of a compound supplier.

Advanced2 min readArticleUpdated 2026-10-24HNBRFKMFEPMFFKM
Cover image: "Oil and gas elastomer qualification: NORSOK M-710, ISO 23936-2, API 6A and NACE TM0297", with a document with a check mark.

Oil and gas buyers do not accept an elastomer on a datasheet alone. They want qualification against a recognised protocol.

Documents in common use

Document Scope
NORSOK M-710 Qualification of non-metallic sealing materials and manufacturers; includes ageing and RGD tests; widely used in Norway and for subsea projects
ISO 23936-2 Non-metallic materials in contact with media related to oil and gas production, Part 2: elastomers
API 6A Annex F / ISO 10423 Wellhead and tree equipment; performance verification including elastomer temperature ratings
API 17D, 17TR8 Subsea equipment and design guidance
NACE TM0187 Evaluating elastomers for sour environments
NACE TM0297 Effects of high-temperature, high-pressure carbon dioxide decompression on elastomeric materials
ISO 13628 series Subsea production systems
ISO 15156 Materials for H2S service (mainly metals)

What the tests cover

  1. Fluid ageing in oil, brine, methane, CO2 and H2S mixtures at temperature and pressure.
  2. Rapid gas decompression cycles and rating of blisters and cracks.
  3. Compression set and stress relaxation.
  4. Low temperature where relevant.
  5. Physical property retention after ageing.
  6. Manufacturing control: batch consistency, raw material approval, change control.

The qualification flow

  1. Supplier submits compound, test plan, raw materials list.
  2. An accredited lab runs ageing and RGD tests.
  3. Results are rated against acceptance criteria.
  4. A compound is approved with a limited scope (fluid, temperature, pressure, dimensions).
  5. Manufacturing is audited; changes need re-approval.

For a new compounder

  • Expect 6 to 18 months and a significant cost for first qualification.
  • Plan a small number of well-chosen compounds, not many.
  • Share only data you can legitimately share; keep proprietary formulae confidential via the lab arrangement.
  • Build quality system evidence: batch records, calibrated equipment, traceability.

What to ask a supplier

Which standard, which revision, which lab, which scope, which compound code and which manufacturing site. Request the report and verify that the scope covers your application.

About this article. It is original writing prepared from public sources, standards and general industry practice. It is not a copy of any book or standard and it is not engineering advice. Confirm values against the current edition of the standard and test in your own application. Only analyse material you own or are entitled to analyse.

Stuck on a sealing problem?

Send the drawing, fluid, temperature and what failed. We reply by email with the likely cause and the next test.